00:00:00.000 — A clearer handover: make missing timing explicit. 00:00:03.920 — Actual before and after responses, shown unchanged. 00:00:08.000 — Start with the saved Operations handover specialist. 00:00:12.160 — Operations Planner remains the accountable role. 00:00:16.000 — The job: turn supplied dock facts into a handover. 00:00:20.348 — This test uses the configured Azure model. 00:00:24.000 — Shared instructions set the four-section format. 00:00:27.728 — This example needs no reference lookup or outside tool. 00:00:32.000 — Check the instructions the specialist will receive. 00:00:36.121 — This preview does not ask the AI to do the work. 00:00:40.000 — Test the actual supplied facts in the native builder. 00:00:44.077 — Twelve pallets await inspection; seven are cleared. 00:00:48.000 — The first test returned the requested handover. 00:00:51.917 — The original answer and run record are preserved. 00:00:56.000 — The first result met the original requirement. 00:00:59.874 — New criterion: flag a missing follow-up deadline. 00:01:04.000 — Add the missing-deadline rule to the job instructions. 00:01:08.075 — Keep the four headings and supplied facts unchanged. 00:01:12.000 — Save the change in the real builder. 00:01:14.851 — The model, shared instructions, placement and role stay the same. 00:01:20.000 — Rerun exactly the same supplied facts. 00:01:23.663 — Only the saved job instructions have changed. 00:01:28.000 — The new response says: Deadline: not supplied. 00:01:31.833 — The run used the shared instructions and no tools. 00:01:36.000 — Daniel opens the same revised, shared setup. 00:01:39.592 — Both demonstration accounts have administrator access. 00:01:44.000 — This shows one change working on the repeated input. 00:01:47.649 — Test supplied deadlines and other inputs before relying on it.